| Project 1 Ultrasound
Suite
- Documentation of Ultrasound Suite of suite design for DOH approval.
- Completion: July, 2000
Project 2 Pre-Anestesia
Clinic
-
Fit-out
of 5,000 s.f. of hospital space for the Pre-Anesthesia Clinic,
Anesthesiologist on-call room, computer training area, physicians'
offices and administration space. Required PA DOH approval.
- Completed: October, 2002
- Construction Cost: $350,000
Project 3 Nurses
Station
- Renovation of 5th floor nurses station and creation of subwaiting
space.
- The space required PA DOH approval.
- Completed: October, 2002 - Construction Cost: $30,000
Project 4 Catheterization
Holding Facility
Project 5 Radiology
Department Reorganization
-
Department-wide
reorganization study of the hospital's 34,000 s.f. in-patient
and out-patient diagnostic and interventional radiology
facility.
- The facility includes a
new radiology reading room with PACS capability, a new radiology
holding area with monitored beds, litter space and wheelchair space.
The facility also includes mammography,
fluoroscopy, digital radiology, angiography, nuclear medicine, C.T.,
X-ray, urology, ultrasound, etc., as well as cesium storage, patient
and staff dressing areas, department offices, conference spaces,
computer rooms, film storage, new outpatient reception/waiting area,
and staff lounge space.
- The facility must meet PA
DOH requirements and will completed in a phased construction schedule.
- Design Completion Date:
June 2005 – Est Construction Cost: $3,000,000
Project 6 Pharmacy
Relocation
- Research and schematic design for
temporary pharmacy relocation.
- Design was for 1200 s.f. of space,
design included Class 100 clean room design with multiple biological
safety cabinets
- Completed
- Summer 2002
Project 7 Renal
Dialysis
- Renal Dialysis
renovation for Reverse Osmosis water purification system. New 120
s.f. RO water system room. 12 station RO loop in Renal Dialysis
unit.
- Completion
- June 1, 2004 - Estimated Construction Cost - $200,000
Project 8 Mens
Toilet Room
- Renovations
to provide new handicapped-accessible men's toilet serving the vicinity
of the hospital cafeteria.
- Design completion
- April, 2004 - Estimated Construction Cost - $50,000
Project 9 Physical
Therapy Storage
- Renovations
to 1,300 s.f. physical therapy storage facility.
- Design completion
- August, 2004 - Estimated Construction Cost - $15,000
Project 10
PACS, Nuclear Camera, Ultrasound Renovations
- Renovations
to 3,150 s.f. of existing radiology space to allow for the installation
of a new nuclear camera suite, a new, state-of-the-art PACS Reading
Room suite, new Ultrasound facilities and the office for the head
of Radiology Department.
- Work included
creating functional workspace within existing radiology vaults,
complete gutting and renovation of some spaces, new casework, new
ceiling, finishes, and placement of new equipment.
- Work proceeded
while allowing remainder of department to continue to function without
disruption.
- Design completion
- 2004 - Estimated Construction Cost - $500,000
Project 11
Cardiac Catheterization Laboratory
1
- Renovations
to 515 s.f. cardiac catheterization lab to allow for the installation
of a new GE Innova 2000 Digital Cardiovascular Imaging system.
- Work included
modifications to casework, new ceiling, finishes, placement of new
equipment, and modifications to the adjacent control room.
- Design completion
- December, 2004 - Estimated Construction Cost - $100,000
Project 12
Cardiac Catheterization Laboratory
4
- Renovations
to 900 s.f. area including cardiac catheterization lab, control
room and office.
- Design to
allow for the installation of a new GE Innova 2000 Digital Cardiovascular
Imaging system.
- Work included
modifications to casework, new ceiling, finishes, placement of new
equipment.
- Design completion
- May, 2005 - Estimated Construction Cost - $230,000
Project 13 5th
Floor West Nurses Station/Clean Utilities Storage
- Included feasibility
study of options of a series of changes on the floor including changes
to the nurses station, med storage, soiled and clean utilities etc.
- Design of
changes to nurses station, clean utilities storage.
- Design completion
- April, 2005 - Estimated Construction Cost - $40,000
Project 14 Renal
Dialysis Nurses Station and Renovations
- Included feasibility
study of options for a new nurses station, new lighting for renal
dialysis treatment area, and the installation of individual armature-mounted
televisions for use by the patients.
- Design of
changes to nurses station, clean utilities storage.
- Design completion
- on hold- Estimated Construction Cost - $35,000
Project 15 Corridor
Renovations
- Renovations
to 130 s.f. of intensive care/cardiac care corridor to change the
worn 1970's institutional look to a warmer feel, whole improving
the ability of the space to take the wear of heavy gurney traffic.
- Work involved
the addition of doors and signage to aid in controlling access and
directing the public.
- Design completion
- June, 2005 - Estimated Construction Cost - $76,000
Project 16
Cardiac Catheterization Laboratory 2
- Renovations
to 750 s.f. cardiac catheterization lab and control room space to
allow for the installation of a new GE Innova 2100 Digital Cardiovascular
Imaging system.
- Work included
modifications to casework, new ceiling, finishes, placement of new
equipment, and modifications to the adjacent control room.
- Completion
- January, 2006 - Construction Cost - $180,000
Project 17
Corridor/Toilet Room Renovations
- Renovations
to 1750 s.f. of three existing Corridor space to upgrade the finishes
and remove the aged appearance and existing damage.
- Work included
renovations to two existing toilet facilities, totaling 275 s.f.
to remove the aged appearance of the finishes.
- The work was
designed to be completed in a phased manner to aid in circulation
and infection control.
- Completion
- spring, 2006 - Construction Cost - $190,000
Project 18 Radiology
Lounge/Offices
- Renovations
to 600 s.f. of existing space to allow for a physicians lounge and
a shared office space.
- Completion
- spring, 2006 - Construction Cost - $50,000
Project 19
Computerized Tomographic Imaging Suite
- Renovations
to 1,000 s.f. of existing radiology spaces for a new Computerized
Tomographic Imaging suite, including the CT room, control room,
storage space and corridor gurney parking alcove.
- Completion
- September, 2006 - Construction Cost - $600,000
Project 20 Operatory
Renovations to four Existing Facilities
- Renovations
to four widely separated existing operatories in the main operatory
suite, totaling 2,300 s.f.
- Work will include
upgrading of finishes, new surgical lights and ceiling-mounted anesthesia
booms.
- Design
will allow for the work to be completed in a phase manner.
- Completion
- September, 2007 - Construction Cost - $500,000
Project 21
Renovations to two Operatories
- Renovations
to two separated existing operatories, comprising 1,350 s.f. in
the main operatory suite.
- First operatory
is a dedicated cardiac O.R. equipped with five ceiling-mounted
booms for surgical lights, anesthesia, digital camera, perfusion
monitors, etc.
- Second operatory
is for general surgical use, equipped with surgical light boom,
and anesthesia boom, digital camera, etc.
- Work includes
the renovation of a substerile room adjacent to the general surgical
O.R.
- Work includes
upgrading of finishes, and the installation of AV documentation
center
- Completion
- Fall, 2007 - Construction Cost - $400,000
Project 22
Renovations to Psychiatric Wing
- Conversion of two existing
spaces (425 s.f.) into patient rooms.
- An existing dayroom was
renovated into a double patient room.
- An existing assisted toilet/bath
facilities was renovated into a single patient room.
- All equipment chosen
for use in the room had to be suicide and vandal resistant.
- Rooms equipped with wicket
door for emergency staff access.
- Completion - March, 2007
- Construction Cost - $158,000
Project 23 Renovations
for New Digital Radiography Room #1
- Preliminary design for
the conversion of an existing X-ray room and adjacent toilet room
into a new 365 s.f. digital radiography room.
- creation of
a new control area.
- Coordinated with GE
Medical Systems on placement of new equipment..
- Design Completed
- Spring, 2007 - Estimated Construction Cost - $300,000
Project 24 Invasive
Service Lounge and Storage
- Renovations of existing
EP Lab and storage to create a new 950 s.f. lounge for the Heart
Catheterization and Electrophysiology Departments.
- Renovations of current
lounge into a 200 s.f. storage facility within Cath Lab core.
- Lounge facility design
with meeting and seminar AV capabilities.
- Completion
- Fall, 2007 - Construction Cost - $150,000
Project 25 Renovations
to General Radiology Room #2
- Renovation of existing 260 s.f. radiology room
to create a new digital chest room and control area.
- Completion
- Winter, 2007 - Construction Cost - $150,000
Project 26 Programming
Analysis for Cardio-Thoracic Practice
- Programming
analysis of existing 3,200 practice to determine if desired changed
can be completed within the existing facility.
- Completion
- Spring, 2007
Project 27 Renovations
to CT Suite
- Feasability
study for the renovation of existing 1,200 s.f. CT Suite to create
a 64 slice C.T. Suite.
- The existing
two scan room facility was altered to create a single scan room,
patient holding facility, computer image processing and control
room.
- Completion
- Spring, 2008 - Estimated Construction Cost - $600,000
Project 28 Information Services
- Renovation
of 600 s.f. of divided office space to allow for open office plan
for seven (7) people and a kitchenette..
- Completion
- Fall, 2007 - Construction Cost - $50,000
Project 29 Renovations
to O.R. #12
- Conversion
of an existing 700 s.f. operatory into a cardiac operatory.
- O.R. was provided
with new ooverhead 5-boom equipment system for anesthesia, perfusion,
surgical lights, digital camera, etc.
- Work included
upgrades to room finishes and lighting.
- Completion
- Spring, 2008 - Construction Cost - $200,000
Project 30 Renovations
for Pharmacy, Lounge, Women's Locker Room,
and Sewing/Laundry Facility
- Design for
the conversion of an existing 2,150 s.f. of storage to house other
facilities. .
- Facilities
included a 250 s.f. Women's Locker Room space, 300 s.f. Lounge,
450 s.f. Pharmacy space and 1,150 s.f. Sewing/Laundry Facility.
- Spring, 2008
- Construction Cost - $60,000
Project 31 Renovations
of a Ground Floor Women's Locker Room
- Design for
the renovation of an existing 425 s.f. toilet Room Facility.
- Two showers
were added, one accessible.
- An accessible
toilet stall and accessible lavatories were added.
- Finishes and
lighting were upgraded and new counters added.
- Estimated
Completion - Fall, 2008 - Estimated Construction Cost - $40,000
Project 32 Trauma
OR
- Conversion
of two existing operatories into a single 740 s.f. dedicated trauma
operatory. The trauma O.R. is one of the few dedicated trauma operatories
in the midatlantic states area.
- O.R. was provided
with new, overhead 4-boom equipment system for anesthesia, surgical
lights, digital camera, perfusion, etc., placed in a manner to allow
for multiple specialized surgical teams to operate on one patient
simultaneously.
- HVAC system
designed to allow for the rapid heating of the room if patient is
in shock or compromised in other ways.
- Work also
included two new toilet facilities and storage alcoves, new core
systems, finishes, etc.
- Estimated
Completion - Fall, 2008 - Estimated Construction Cost - $600,000
|