- Feasibility study to evaulate expanding existing building or buy and renovate another building.
- Final design to renovate a newly acquired 7,200 s.f building.
- Renovation included township offices, waiting room, public meeting room and police station.
- Project completed April 1996 - Construction cost $225,000.
![]()
- Interior and exterior renovation to provide new entrances to the building's pool, including an accessible exterior ramp and a new interior stair tower.
- Completed April 1998 - Construction cost $110,000.
![]()
- Interior renovations to the pool and locker room facility.
- Work to include complete renovation of locker rooms to provide for accessibility and general improvements; new HVAC and dehumidification system; pool deck resurfacing; new seating; roof structural changes; and new finishes throughout.
- Project is awaiting funding. Estimated construction cost $650,000.
![]()
- Interior renovations required to install a fully accessible, (3) stop, hydraulic elevator.
- Work to include installation of masonry hoistway, relocation of some MEP systems, designed tie-in to existing finishes at each floor level.
- Project is awaiting funding. Estimated construction cost $190,000.
![]()
![]()
- Renovation and addition to township administration offices.
- Design to meet current and future needs for office space, meeting rooms and storage space.
- Project also includes improved configuration of office workstations.
- Construction completed May 2001, Construction Cost $1,000,000.
| |
|
|||
|
|
|
|
|
|
|
|
|
|
|
|